Construction Progress |
|
|
|
|
Soil Waste And Kitchen Waste System , Dec, 2008
|
Slab Floor 29, Dec, 2008 |
|
|
Pouring Concrete Floor 29 , Dec, 2008
|
Finish Architecture Room, Dec, 2008 |
|
|
Finish Architecture Room , Dec, 2008
|
Ceiling Work M&E , Dec, 2008 |
|
|
Brick work&Air condition floor 2 , Nov, 2008
|
Brick work&Air condition floor 2, Nov, 2008 |
|
|
topping work floor 11 , Nov, 2008
|
tiling work floor 9, Nov, 2008 |
|
|
remove form work colum floor 26 , Nov, 2008
|
ceiling work floor 9 , Nov, 2008 |
|
|
over all , Nov, 2008
|
|
|
|
Rebar wall SW-1 work Floor 22 , Oct, 2008
|
Plastering work Floor 10, Oct, 2008 |
|
|
Frame ceiling work Floor 9 , Oct, 2008
|
Block wall work Floor 16, Oct, 2008 |
|
|
Air Condition work , Oct, 2008
|
Scaffloding Floor work 23 , Oct, 2008 |
|
|
Side view south zone , Oct, 2008
|
Slab Floor 18, Sep, 2008 |
|
|
Branch SPK and Electrical Floor , Sep, 2008
|
Side View North, Sep, 2008 |
|
|
Plastering wall Floor 9 , Sep, 2008
|
Floor 8 Swimming Pool , Sep, 2008 |
|
|
Bricks and System work Floor 1 , Aug, 2008
|
Bricks and System work Floor 8, Aug, 2008 |
|
|
Bricks and System work Floor 9 , Aug, 2008
|
Side View North, Aug, 2008 |
|
|
Slab And Column Floor 15 , Aug, 2008
|
Swimming Pool , Aug, 2008 |
|
|
Branch SPK And Electrical Floor , July, 2008
|
Branch SPK And Electrical Floor, July, 2008 |
|
|
Side View North , July, 2008
|
Side View South, July, 2008 |
|
|
Slab And Column Floor-11 , July, 2008
|
Brick Work Floor-1 , July, 2008 |
|
|
Side View South , June, 2008
|
Side View North , June, 2008 |
|
|
Main Fire Protection Floor 1 , June, 2008
|
Column Floor 8 , June, 2008 |
|
|
Branch Sprinkler and Electrica , June, 2008
|
Slab Floor 8 , June, 2008 |
|
|
Conduit For Lighting Carpark Floor 3 , May, 2008
|
Piping Toilet T-03,T-04 , May, 2008 |
|
|
Floor 6' Zone C , May, 2008 |
Stair _ 2 Floor 7 (MAZ)
, May, 2008 |
|
|
Side View -1
, May, 2008 |
Side View -2
, May, 2008 |
|
|
Floor 6 (Zone A), April, 2008 |
Floor 6 (Zone B), April, 2008 |
|
|
Floor 6 (Zone A), April, 2008 |
Floor 6 (Zone B), April, 2008 |
|
|
Floor 6 (Zone A), April, 2008 |
Floor 6 (Zone B), April, 2008 |
|
|
Floor 6 (Zone A), April, 2008 |
Floor 6 (Zone B), April, 2008 |
|
|
Lift Core Floor 8, April, 2008 |
OverAll, April, 2008 |
|
|
Ramp Floor 3-4, April, 2008 |
Electrical Work Floor 2, April, 2008 |
|
|
Floor 4 (Zone B), Mar, 2008 |
Floor 4 (Zone A), Mar, 2008 |
|
|
Sanitary Work Under Ground Floor, Mar, 2008 |
Ramp Floor 2-3, Mar, 2008 |
|
|
Floor 2, Feb, 2008 |
Wall Ramp, Feb, 2008 |
|
|
Lift Core, Feb, 2008 |
Waste Water Treatment Plan, Feb, 2008 |
|
|
Jan 15, 2008 |
Jan 15, 2008 |
|
|
Jan 15, 2008 |
Jan 15, 2008 |
|
|
1st Floor Structure |
1st Floor Structure |
|
|
1st Floor Structure |
1st Floor Structure |
|
|
Underground Water Tank , November 4,2007 |
Underground Water Tank , November 4,2007 |
|
|
Underground Water Tank , November 4,2007 |
Underground Water Tank , November 4,2007 |
|
|
Sheet Pile Work , Aug 20,2007 |
Sheet Pile Work , Aug 20,2007 |
|
|
Sheet Pile Work , Aug 20,2007 |
Piling work, April 2007 |
|
|
Piling work, April 2007
|
Piling work, April 2007 |
|
|
| Piling work, April 2007 |
Piling work, April 2007 |
| |
|
| |
|
| |
|
| |
|
|